Substation Scout

Glen Gardner substation interconnection queue

1 active project totaling 0.8 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Glen Gardner as the point of interconnection, all in Hunterdon County, NJ.

Target commercial operation dates as filed run from Dec 2011 to Dec 2027 (3 filings).

1active projects
0.8active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI1-187 Glen Gardner 230 kV 230 280 Battery Withdrawn Dec 2027
AF1-105 Holly Glen 34.5 20 Battery Withdrawn Dec 2024
Y1-072 Lebanon Solar 12 0.8 Solar In Service Dec 2011

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Glen Gardner (JCPL, 11 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Other PJM queue substations in Hunterdon County, NJ

All 89 PJM queue filings in Hunterdon County, NJ.