Hawks substation interconnection queue
1 active project totaling 1.1 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Hawks as the point of interconnection, all in Hunterdon County, NJ.
Target commercial operation dates as filed run from Dec 2014 to Mar 2023 (3 filings).
1active projects
1.1active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-208 | Hawks 12.5 kV | 12.5 | 1.6 | Solar | Withdrawn | Mar 2023 |
| W4-097 | Wetteland Solar Farm | 12.5 | 1.1 | Solar | In Service | Jul 2016 |
| Z2-093 | Hawks 12kV | 12 | 0 | Battery | Withdrawn | Dec 2014 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Hunterdon County, NJ
- Clinton: 3 active, 949.4 MW of 5 filed
- Pleasant Valley: 3 active, 800 MW of 5 filed
- East Flemington: 1 active, 500 MW of 3 filed
- Frenchtown: 3 active, 7.9 MW of 6 filed
- Ringoes-US Bronze: 1 active, 3.8 MW of 2 filed
- Gilbert-Morris Park: 1 active, 3.2 MW of 4 filed
- Buckeye-Ringoes: 1 active, 3.2 MW of 2 filed
- Flemington: 2 active, 2.3 MW of 3 filed
- Ringoes: 1 active, 1.1 MW of 4 filed
- Glen Gardner: 1 active, 0.8 MW of 3 filed
- Franklin: none active of 7 filed
- Gilbert: none active of 5 filed
- Baptistown-Frenchtown: none active of 4 filed
- Milford: none active of 4 filed
- Lebanon: 1 active, 0 MW of 3 filed
- Baptistown-Frenchtown #2: none active of 2 filed
- Clinton-Round Valley: none active of 2 filed
- Franklin #2: none active of 2 filed
- Frenchtown-Rosemont: none active of 2 filed
- Rocktown 4.8kV: none active of 2 filed