Hawks substation interconnection queue

1 active project totaling 1.1 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Hawks as the point of interconnection, all in Hunterdon County, NJ.

Target commercial operation dates as filed run from Dec 2014 to Mar 2023 (3 filings).

1active projects
1.1active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-208 Hawks 12.5 kV 12.5 1.6 Solar Withdrawn Mar 2023
W4-097 Wetteland Solar Farm 12.5 1.1 Solar In Service Jul 2016
Z2-093 Hawks 12kV 12 0 Battery Withdrawn Dec 2014

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.