Pine Creek substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2011 to Dec 2029 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-615 | Pine Creek 138 kV | 138 | 100 | Battery | Withdrawn | Oct 2025 |
| V4-059 | Pine Creek 46kV | 46 | 20 | Other | Withdrawn | Dec 2011 |
| AF2-368 | Allegheny Lock and Dam No. 2 Hydroelectric Project | 23 | 9.5 | Hydro | Withdrawn | Dec 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Allegheny County, PA
- Clinton: 3 active, 949.4 MW of 5 filed
- Springdale: 2 active, 613 MW of 4 filed
- Wilson: 1 active, 300 MW of 6 filed
- Dans Mountain: 1 active, 14 MW of 3 filed
- Brunot Island: none active of 4 filed
- Elrama-Mitchell: none active of 4 filed
- Neville: none active of 3 filed
- Imperial-Joffre: none active of 2 filed
- Savage: none active of 2 filed
- Swickley - Ambridge: none active of 2 filed
- Westvaco: none active of 2 filed
Other PJM queue substations in Mingo County, WV
No other substation in Mingo County, WV is named as a point of interconnection in the PJM queue.