Pine Creek substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-615 Pine Creek 138 kV 138 100 Battery Withdrawn
V4-059 Pine Creek 46kV 46 20 Other Withdrawn
AF2-368 Allegheny Lock and Dam No. 2 Hydroelectric Project 23 9.5 Hydro Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.