Gilbert substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AB1-154 Gilbert 230kV 230 1,028 Gas Withdrawn
A46 Gilbert 115 kV 115 100 Gas Withdrawn
AG1-487 Gilbert Solar and BESS 230 20 Hybrid Withdrawn
V1-009 Gilbert 46kV 46 11 Hydro Withdrawn
AB2-127 Gilbert 34.5kV 34.5 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.