Gilbert substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB1-154 | Gilbert 230kV | 230 | 1,028 | Gas | Withdrawn |
| A46 | Gilbert 115 kV | 115 | 100 | Gas | Withdrawn |
| AG1-487 | Gilbert Solar and BESS | 230 | 20 | Hybrid | Withdrawn |
| V1-009 | Gilbert 46kV | 46 | 11 | Hydro | Withdrawn |
| AB2-127 | Gilbert 34.5kV | 34.5 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.