Baptistown-Frenchtown #2 substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W3-147 Baptistown-Frenchtown #2 34.5kV 34.5 3.8 Solar Withdrawn
X1-079 Baptistown-Frenchtown #2 34kV 34 3.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.