Substation Scout

Baptistown-Frenchtown #2 substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W3-147 Baptistown-Frenchtown #2 34.5kV 34.5 3.8 Solar Withdrawn
X1-079 Baptistown-Frenchtown #2 34kV 34 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.