Rocktown 4.8kV substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Rocktown 4.8kV as the point of interconnection, all in Hunterdon County, NJ.

Target commercial operation dates as filed run from Dec 2014 to May 2017 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
W2-076 West Amwell Mason Supply Solar Farm n/r 0.8 Solar Withdrawn May 2017
W4-053 Green Power West Amwell Solar Farm n/r 0 Solar Withdrawn Dec 2014

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.