Hughesville substation interconnection queue
3 active projects totalling 200 MW in the PJM queue, plus 3 with terminal status (shown greyed).
3active projects
200active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1560 | Hughesville 69 kV | 69 | 100 | Battery | Active |
| C01-1561 | Hughesville 69 kV | 69 | 50 | Battery | Active |
| C01-1562 | Hughesville 69 kV | 69 | 50 | Battery | Active |
| AE1-231 | Hughesville 69 kV | 69 | 9.4 | Hybrid | Withdrawn |
| AH1-154B | Hughesville 12 kV | 12 | 3 | Solar | Withdrawn |
| AH2-176 | Hughesville 12 kV | 12 | 0 | Hybrid | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.