Clinton II substation interconnection queue

1 active project totalling 3.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
3.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-417 Clinton 69 kV II 69 88 Hybrid Withdrawn
AD1-135 Gaucho Solar 23 3.2 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.