Clinton II substation interconnection queue
1 active project totalling 3.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
3.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-417 | Clinton 69 kV II | 69 | 88 | Hybrid | Withdrawn |
| AD1-135 | Gaucho Solar | 23 | 3.2 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.