Franklin substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatus
AH1-367 Franklin 138 kV 138 54 Hybrid Withdrawn
AB2-015 Tidewater Solar Projects 115 50 Solar Withdrawn
AI2-185 Franklin 138 kV 138 41 Hybrid Withdrawn
AI2-186 Franklin 138 kV 138 20.3 Hybrid Withdrawn
AB1-171 Franklin Generation Facility 25 20 Gas Withdrawn
AF2-400 Delaware Road Solar 13.2 2.7 Solar Withdrawn
X2-054 Quakertown Solar Farm #2 n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.