Franklin substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 7 with terminal status (shown grayed).

Target commercial operation dates as filed run from Apr 2016 to Sep 2023 (7 filings).

0active projects
0active MW
7total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-367 Franklin 138 kV 138 54 Hybrid Withdrawn Sep 2023
AB2-015 Tidewater Solar Projects 115 50 Solar Withdrawn Dec 2022
AI2-185 Franklin 138 kV 138 41 Hybrid Withdrawn Sep 2023
AI2-186 Franklin 138 kV 138 20.3 Hybrid Withdrawn Sep 2023
AB1-171 Franklin Generation Facility 25 20 Gas Withdrawn Oct 2019
AF2-400 Delaware Road Solar 13.2 2.7 Solar Withdrawn May 2022
X2-054 Quakertown Solar Farm #2 n/r 0 Solar Withdrawn Apr 2016

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Greene County, PA

All 29 PJM queue filings in Greene County, PA.

Other PJM queue substations in Southampton County, VA

All 31 PJM queue filings in Southampton County, VA.

Other PJM queue substations in Hunterdon County, NJ

All 89 PJM queue filings in Hunterdon County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first