Frenchtown-Rosemont substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W2-083 Perotti Solar Farm 34.5 6.5 Solar Withdrawn
W3-149 Route 519 Solar Farm 34.5 6.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.