Swickley - Ambridge substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH2-244 Swickley - Ambridge 23 kV 23 25 Battery Withdrawn
AH2-245 Swickley - Ambridge 23 kV 23 25 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.