Smith-N. Fayette substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z2-064 Smith-N. Fayette 138kV 138 600 Gas Withdrawn
AA2-043 Smith-N. Fayette 138kV 138 99 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.