Imperial-Joffre substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Imperial-Joffre as the point of interconnection, all in PA.

Target commercial operation dates as filed run from Jun 2024 to Jul 2028 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-527 Beech Hollow Solar 138 129 Solar Withdrawn Jul 2028
AG2-688 Imperial-Joffre 138 kV 138 40 Battery Withdrawn Jun 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Allegheny County, PA

All 64 PJM queue filings in Allegheny County, PA.

Other PJM queue substations in Clearfield County, PA

All 53 PJM queue filings in Clearfield County, PA.