Wylie Ridge substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB1-069 | Beech Hollow Energy Center | 500 | 950 | Gas | Withdrawn |
| AE1-080 | Wylie Ridge 500 kV | 500 | 80 | Gas | Withdrawn |
| AG2-140 | Wylie Ridge 345 kV | 345 | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.