Gilbert-Morris Park substation interconnection queue

1 active project totalling 3.2 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
3.2active MW
4total filed
Queue IDProjectkVMWResourceStatus
AD2-006 Gilbert-Morris Park 34.5 kV 34.5 3.2 Solar Withdrawn
AD2-037 Gilbert-Morris Park 34.5 kV 34.5 3.2 Solar Withdrawn
AD2-070 Milford Solar Farm 34.5 3.2 Solar In Service
W3-001 Alpha Solar Farm 34.5 3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.