Byron substation interconnection queue
1 active project totaling 43 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2021 to Jun 2027 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: ComEd (1 filing).
1active projects
43active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB1-121 | Byron 345kV | 345 | 1,927 | Not reported | Withdrawn | Dec 2021 |
| AH1-702 | Byron 345 kV | 345 | 43 | Nuclear | Active | Jun 2027 |
| AG1-309 | Byron 345 kV | 345 | 0 | Not reported | Withdrawn | Jan 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Ogle County, IL
- BYRON - WEMPLETOW: 2 active, 463.6 MW of 2 filed
- Byron - Wayne: 1 active, 198.6 MW of 3 filed
- Rochelle: 3 active, 22 MW of 3 filed
- Twombley Road: 1 active, 20 MW of 2 filed
- Twombly Road: 1 active, 15.4 MW of 2 filed
- Stillman Valley: none active of 4 filed
- Maryland: none active of 3 filed
- White Rock - Wayne: none active of 3 filed
- Dixon-Cherry Valley: none active of 2 filed
- Lancaster-Maryland: none active of 2 filed
Other PJM queue substations in Washington County, PA
- Clinton: 3 active, 949.4 MW of 5 filed
- Wilson: 1 active, 300 MW of 6 filed
- Vanceville: 1 active, 200 MW of 2 filed
- Motion-Ridgeway: 1 active, 12 MW of 2 filed
- Clinton II: 1 active, 3.2 MW of 2 filed
- Windsor: none active of 5 filed
- Champion: none active of 3 filed
- Wylie Ridge: none active of 3 filed
- Hunterstown-Jackson: none active of 2 filed
- Smith-N. Fayette: none active of 2 filed