Substation Scout

Byron substation interconnection queue

1 active project totaling 43 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2021 to Jun 2027 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: ComEd (1 filing).

1active projects
43active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AB1-121 Byron 345kV 345 1,927 Not reported Withdrawn Dec 2021
AH1-702 Byron 345 kV 345 43 Nuclear Active Jun 2027
AG1-309 Byron 345 kV 345 0 Not reported Withdrawn Jan 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Ogle County, IL

All 40 PJM queue filings in Ogle County, IL.

Other PJM queue substations in Washington County, PA

All 27 PJM queue filings in Washington County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first