Saegers substation interconnection queue

2 active projects totalling 30 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
30active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF2-140 Patriot Generating Station 230 30 Gas In Service
AH1-707 Saegers 230 kV 230 30 Gas Withdrawn
AA2-008 Patriot Generating Station 230 0 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.