Named in 1 PJM planning document for 1 project, on August 14, 2025.

Not stateddescribed as
METEDzone
115 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Round Top Substation
ME-2023-020
Conceptual $22.1M 6/2/2028 approximately 18.8 MW 2025-08-14
SRRTEP Mid-Atlantic

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ALLEN; CLY; DILLSBURG; GARDNERS; NEWBERRY; ROUND TOP; ROUNDTOP → ALLEN; CLY; GARDNERS; ROUND TOP; ROUNDTOP 2025-08-14 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2025-08-14 SRRTEP Mid-Atlantic
Item 05 - MetEd Supplemental Projects p. 5
Round Top Substation No role wording
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.