Everitt Solar Farm
PJM queue ID W2-061
Everitt Solar Farm (W2-061) is listed in the PJM interconnection queue as a 1.1 MW solar project in Hunterdon County, NJ. The filing names Ringoes as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 18, 2017.
| Queue ID | W2-061 |
|---|---|
| Project name | Everitt Solar Farm |
| Status (as published) | In Service |
| Substation | Ringoes |
| Point of interconnection | Ringoes 12kV |
| County | Hunterdon |
| State | NJ |
| Voltage | 12 kV |
| Capacity | 1.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2017-01-18 |
| Source dataset | serial |
Same substation and county
Ringoes substation: 4 requests in the PJM queue, 1 active totaling 1.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| W2-064 | Ringoes Solar Farm | 3.8 | Solar | Withdrawn |
| Y2-029 | Ringoes 12kV | 0.4 | Solar | Withdrawn |
| X2-078 | Ringoes | 0 | Solar | Withdrawn |
Hunterdon, NJ: 89 requests in the PJM queue, 26 active totaling 863.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 3 |
| MW capacity | 1.1 |
| MFO | 3 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.