Substation Scout

Devils Brook substation interconnection queue

3 active projects totalling 3.9 MW in the PJM queue.

3active projects
3.9active MW
3total filed
Queue IDProjectkVMWResourceStatus
V3-024 RE Cranbury Solar I, LLC 13.2 1.9 Solar In Service
W3-124 Matrix-Stults Road 13 1.1 Solar In Service
X2-088 Black Rock Solar 13 0.9 Solar In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.