Deans substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-037 | Deans 500kV | 500 | 1,200 | Wind | Withdrawn |
| U2-047 | Deans 500kV | 500 | 660 | Not reported | Withdrawn |
| AI1-109 | Deans 500 kV | 500 | 393 | Offshore Wind | Withdrawn |
| AG2-055 | Deans 500 kV | 500 | 370.9 | Offshore Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.