Raritan River 230kV

PJM queue ID X4-005

Raritan River 230kV (X4-005) is listed in the PJM interconnection queue as a gas request filed at 0 MW (a net change or energy-only filing) in Middlesex County, NJ. The filing names Raritan River as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2017.

Queue IDX4-005
Project nameRaritan River 230kV
Status (as published)In Service
SubstationRaritan River
Point of interconnectionRaritan River 230kV
CountyMiddlesex
StateNJ
Voltage230 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2017-06-01
Source datasetserial

Same substation and county

Raritan River substation: 8 requests in the PJM queue, 4 active totaling 1,060 MW.

Queue IDProjectMWResourceStatus
W4-009Woodbridge Energy Center725GasIn Service
AF2-413Woods Landing Energy Storage250BatteryEngineering and Procurement
C01-1698Raritan River 230 kV85BatteryActive
Y1-025Raritan River 230kV725GasWithdrawn
AG2-076Raritan River 230 kV660Not reportedWithdrawn
AD1-113Woodbridge Energy Center75GasWithdrawn
C01-1012Raritan River 230 kV0BatteryWithdrawn

Middlesex, NJ: 120 requests in the PJM queue, 33 active totaling 4,764.7 MW.

A substation with the same name is named in PJM transmission planning materials: Raritan River Substation (JCPL, 21 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy60
MW capacity0
MFO785

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first