Howell substation interconnection queue

1 active project totalling 6.5 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
6.5active MW
2total filed
Queue IDProjectkVMWResourceStatus
X1-037 Howell Solar Farm n/r 6.5 Solar In Service
X2-001 Howell n/r 3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.