Raritan River 230 kV (C01-1698) is listed in the PJM interconnection queue as a 85 MW battery project in Middlesex County, NJ. The filing names Raritan River as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of May 31, 2029.

Queue IDC01-1698
Project nameRaritan River 230 kV
Status (as published)Active
SubstationRaritan River
Point of interconnectionRaritan River 230 kV
CountyMiddlesex
StateNJ
Voltage230 kV
Capacity85 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-05-31
Source datasetcycle

Same substation and county

Raritan River substation: 8 requests in the PJM queue, 4 active totaling 1,060 MW.

Queue IDProjectMWResourceStatus
W4-009Woodbridge Energy Center725GasIn Service
AF2-413Woods Landing Energy Storage250BatteryEngineering and Procurement
X4-005Raritan River 230kV0GasIn Service
Y1-025Raritan River 230kV725GasWithdrawn
AG2-076Raritan River 230 kV660Not reportedWithdrawn
AD1-113Woodbridge Energy Center75GasWithdrawn
C01-1012Raritan River 230 kV0BatteryWithdrawn

Middlesex, NJ: 120 requests in the PJM queue, 33 active totaling 4,764.7 MW.

A substation with the same name is named in PJM transmission planning materials: Raritan River Substation (JCPL, 21 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperCPV Shore, LLC
Transmission ownerJCPL
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy85.0
MW capacity85.0
MFO870.0
Submitted date4/27/2026
Last updated6/8/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first