Edison 4kV substation interconnection queue

1 active project totalling 0.2 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
0.2active MW
2total filed
Queue IDProjectkVMWResourceStatus
AC2-024 Edison 4kV n/r 0.2 Solar Withdrawn
AE1-041 Highland Park n/r 0.2 Hybrid In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.