Metuchen substation interconnection queue
1 active project totalling 2.5 MW in the PJM queue, plus 5 with terminal status (shown greyed).
1active projects
2.5active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-082 | Metuchen 230kv | 230 | 671 | Gas | Withdrawn |
| Z1-116 | CPV Keasbey Energy Center | 230 | 671 | Gas | Withdrawn |
| T119 | Metuchen 230kV | 230 | 600 | Gas | Withdrawn |
| W4-080 | IRL Landfill Solar Project | 26.4 | 7.6 | Solar | Withdrawn |
| AA1-073 | Middlesex Plant | 26 | 3.9 | Gas | Withdrawn |
| AB1-139 | Nixon Lane Solar | 26 | 2.5 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.