Edison substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AA2-125 Edison 138kV 138 504 Gas Withdrawn
AB2-009 Edison 138kV 138 105 Gas Withdrawn
AB2-008 Edison 138kV 138 96 Gas Withdrawn
Y3-049 Edison n/r 12 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.