Edison substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-125 | Edison 138kV | 138 | 504 | Gas | Withdrawn |
| AB2-009 | Edison 138kV | 138 | 105 | Gas | Withdrawn |
| AB2-008 | Edison 138kV | 138 | 96 | Gas | Withdrawn |
| Y3-049 | Edison | n/r | 12 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.