Branchburg-Deans substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-142 | Branchburg-Deans 500kV | 500 | 1,278 | Gas | Withdrawn |
| U2-005 | Branchburg-Deans 500kV | 500 | 1,010 | Gas | Withdrawn |
| U2-006 | Branchburg-Deans 500kV | 500 | 1,010 | Gas | Withdrawn |
| AB1-148 | Branchburg-Deans 500kV | 500 | 235 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.