Red Oak substation interconnection queue
4 active projects totalling 125.5 MW in the PJM queue, plus 4 with terminal status (shown greyed).
4active projects
125.5active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q11 | Red Oak 230kV | 230 | 300 | Gas | Withdrawn |
| R39 | Red Oak 230kV | 230 | 300 | Gas | Withdrawn |
| C01-1357 | Red Oak 230 kV | 230 | 71.5 | Battery | Active |
| Q08 | Red Oak 230kV | 230 | 50 | Gas | Withdrawn |
| V3-034 | Red Oak 230kV | 230 | 50 | Gas | Withdrawn |
| C01-2018 | Red Oak 230 kV | 230 | 35 | Gas | Active |
| X1-068 | Red Oak | 230 | 10 | Gas | In Service |
| AE1-036 | Red Oak | 230 | 9 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.