Red Oak substation interconnection queue

3 active projects totaling 90.5 MW in the PJM queue, plus 5 with terminal status (shown grayed).

8 PJM queue filings name Red Oak as the point of interconnection, all in Middlesex County, NJ.

Target commercial operation dates as filed run from Aug 2009 to Apr 2030 (8 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: JCPL (2 filings).

3active projects
90.5active MW
8total filed
Queue IDProjectkVMWResourceStatusTarget COD
Q11 Red Oak 230kV 230 300 Gas Withdrawn Dec 2011
R39 Red Oak 230kV 230 300 Gas Withdrawn Aug 2009
C01-1357 Red Oak 230 kV 230 71.5 Battery Active Apr 2030
Q08 Red Oak 230kV 230 50 Gas Withdrawn Jun 2011
V3-034 Red Oak 230kV 230 50 Gas Withdrawn Jun 2011
C01-2018 Red Oak 230 kV 230 35 Gas Withdrawn Apr 2030
X1-068 Red Oak 230 10 Gas In Service Apr 2011
AE1-036 Red Oak 230 9 Gas In Service Jul 2018

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05C01-2018Terminal status35 Active → Withdrawn

Other PJM queue substations in Middlesex County, NJ

All 120 PJM queue filings in Middlesex County, NJ, including 3 more substations.