Red Oak substation interconnection queue
3 active projects totaling 90.5 MW in the PJM queue, plus 5 with terminal status (shown grayed).
8 PJM queue filings name Red Oak as the point of interconnection, all in Middlesex County, NJ.
Target commercial operation dates as filed run from Aug 2009 to Apr 2030 (8 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: JCPL (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Q11 | Red Oak 230kV | 230 | 300 | Gas | Withdrawn | Dec 2011 |
| R39 | Red Oak 230kV | 230 | 300 | Gas | Withdrawn | Aug 2009 |
| C01-1357 | Red Oak 230 kV | 230 | 71.5 | Battery | Active | Apr 2030 |
| Q08 | Red Oak 230kV | 230 | 50 | Gas | Withdrawn | Jun 2011 |
| V3-034 | Red Oak 230kV | 230 | 50 | Gas | Withdrawn | Jun 2011 |
| C01-2018 | Red Oak 230 kV | 230 | 35 | Gas | Withdrawn | Apr 2030 |
| X1-068 | Red Oak | 230 | 10 | Gas | In Service | Apr 2011 |
| AE1-036 | Red Oak | 230 | 9 | Gas | In Service | Jul 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | C01-2018 | Terminal status | 35 | Active → Withdrawn |
Other PJM queue substations in Middlesex County, NJ
- Sewaren: 4 active, 2,007.2 MW of 13 filed
- Sayreville: 2 active, 1,555 MW of 8 filed
- Raritan River: 4 active, 1,060 MW of 8 filed
- Kearny: 8 active, 931 MW of 12 filed
- Brunswick: 4 active, 153.8 MW of 6 filed
- Parlin: 1 active, 102 MW of 4 filed
- South River: 2 active, 47 MW of 6 filed
- Howell: 1 active, 6.5 MW of 2 filed
- Monroe: 1 active, 4.9 MW of 2 filed
- Devils Brook: 3 active, 3.9 MW of 3 filed
- Metuchen: 1 active, 2.5 MW of 6 filed
- Pierson Avenue: 2 active, 1 MW of 2 filed
- Edison 4kV: 1 active, 0.2 MW of 2 filed
- Branchburg-Deans: none active of 4 filed
- Deans: none active of 4 filed
- Edison: none active of 4 filed
- Somerville: none active of 3 filed
- Atlantic-South River: none active of 2 filed
- Cranbury: none active of 2 filed
- Deep Run: none active of 2 filed
All 120 PJM queue filings in Middlesex County, NJ, including 3 more substations.