Monroe substation interconnection queue

1 active project totalling 4.9 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
4.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH2-378A Monroe 138kV 138 200 Battery Withdrawn
AC1-207 Hoffman Station Road Solar 34.5 4.9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.