Somerville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
E03 Somerville 13.8kV 13.8 5 Gas Withdrawn
X2-002 Somerville 13kV 13 4.3 Solar Withdrawn
AI1-033 Somerville 26 kV 26 3.8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.