South River substation interconnection queue
2 active projects totalling 47 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
47active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A24 | South River 230 kV | 230 | 725 | Gas | Withdrawn |
| R11 | Gateway Energy Center | 230 | 440 | Gas | Withdrawn |
| T76 | South River | 230 | 27 | Gas | In Service |
| AC1-029 | Gateway Energy Center | 230 | 20 | Gas | Withdrawn |
| T75 | South River | 230 | 20 | Gas | In Service |
| Z2-109 | Gateway Energy Center | 230 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.