Substation Scout

Atlantic-South River substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AB1-002 Atlantic-South River 230kV 230 765 Gas Withdrawn
W4-021 Atlantic-South River 230kV 230 738.4 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.