Bridgeport substation interconnection queue

2 active projects totalling 519 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
519active MW
4total filed
Queue IDProjectkVMWResourceStatus
C01-2225 Bridgeport 230 kV 230 300 Other Active
C01-2223 Bridgeport 230 kV 230 219 Battery Active
AG2-450 Bridgeport 230 kV 230 115.3 Battery Withdrawn
AH2-131 Bridgeport 230kV 230 103.7 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.