Bridgeport substation interconnection queue

2 active projects totaling 519 MW in the PJM queue, plus 2 with terminal status (shown grayed).

4 PJM queue filings name Bridgeport as the point of interconnection, all in Gloucester County, NJ.

Target commercial operation dates as filed run from Mar 2025 to May 2030 (4 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: AEC (3 filings).

2active projects
519active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-2225 Bridgeport 230 kV 230 300 Other Active May 2030
C01-2223 Bridgeport 230 kV 230 219 Battery Active May 2030
AG2-450 Bridgeport 230 kV 230 115.3 Battery Withdrawn Jan 2028
AH2-131 Bridgeport 230kV 230 103.7 Battery Withdrawn Mar 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Gloucester County, NJ

All 88 PJM queue filings in Gloucester County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first