Clayton-Williamstown substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Clayton-Williamstown as the point of interconnection, all in Gloucester County, NJ.
Target commercial operation dates as filed run from Jun 2022 to Dec 2026 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-039 | Clayton-Williamstown 69 kV | 69 | 28.7 | Solar | Withdrawn | Jun 2022 |
| AE2-334 | Gloucester Solar I | 69 | 26.4 | Solar | Withdrawn | Dec 2026 |
| AG1-103 | Gloucester Solar I | 69 | 0 | Battery | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Gloucester County, NJ
- Kearny: 8 active, 931 MW of 12 filed
- Mickleton: 4 active, 729.7 MW of 12 filed
- Bridgeport: 2 active, 519 MW of 4 filed
- Clayton: 2 active, 153 MW of 3 filed
- Eagle Point: 2 active, 72.9 MW of 5 filed
- Mickelton: 1 active, 44 MW of 2 filed
- Gloucester: 3 active, 7.1 MW of 8 filed
- Monroe: 1 active, 4.9 MW of 2 filed
- Beaverbrook: 2 active, 2.3 MW of 3 filed
- Deptford: 1 active, 1.9 MW of 6 filed
- Runnemede: 2 active, 1.3 MW of 2 filed
- Romeoville: 2 active, 0.8 MW of 2 filed
- Williamstown: 1 active, 0.6 MW of 6 filed
- Minotola: none active of 5 filed
- Mantua: none active of 4 filed
- Thorofare: 1 active, 0 MW of 4 filed
- Beckett: none active of 2 filed
- Harrison Township: none active of 2 filed
- Nortonville: none active of 2 filed