Runnemede substation interconnection queue
2 active projects totaling 1.3 MW in the PJM queue.
2 PJM queue filings name Runnemede as the point of interconnection, all in NJ.
Target commercial operation dates as filed run from Feb 2017 to Sep 2023 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-264 | Owens Corning Solar | 13 | 1.3 | Solar | In Service | Sep 2023 |
| X3-075 | Owens Corning Solar | 13 | 0 | Solar | In Service | Feb 2017 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Runnemede Station (PSEG, 2 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in Gloucester County, NJ
- Kearny: 8 active, 931 MW of 12 filed
- Mickleton: 4 active, 729.7 MW of 12 filed
- Bridgeport: 2 active, 519 MW of 4 filed
- Clayton: 2 active, 153 MW of 3 filed
- Eagle Point: 2 active, 72.9 MW of 5 filed
- Mickelton: 1 active, 44 MW of 2 filed
- Gloucester: 3 active, 7.1 MW of 8 filed
- Monroe: 1 active, 4.9 MW of 2 filed
- Beaverbrook: 2 active, 2.3 MW of 3 filed
- Deptford: 1 active, 1.9 MW of 6 filed
- Romeoville: 2 active, 0.8 MW of 2 filed
- Williamstown: 1 active, 0.6 MW of 6 filed
- Minotola: none active of 5 filed
- Mantua: none active of 4 filed
- Thorofare: 1 active, 0 MW of 4 filed
- Clayton-Williamstown: none active of 3 filed
- Beckett: none active of 2 filed
- Harrison Township: none active of 2 filed
- Nortonville: none active of 2 filed
Other PJM queue substations in Camden County, NJ
- Silver Lake: 2 active, 240 MW of 7 filed
- Gloucester: 3 active, 7.1 MW of 8 filed
- Marion: 3 active, 6.7 MW of 4 filed
- Beaverbrook: 2 active, 2.3 MW of 3 filed
- Deptford: 1 active, 1.9 MW of 6 filed
- Cinnaminson: 2 active, 1.4 MW of 2 filed
- Camden: 1 active, 0 MW of 8 filed
- Berlin: none active of 4 filed
- Camden-Richmond: none active of 2 filed
- Tansboro: none active of 2 filed
- Winslow: none active of 2 filed