Substation Scout

Eagle Point substation interconnection queue

2 active projects totalling 72.9 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
72.9active MW
5total filed
Queue IDProjectkVMWResourceStatus
A16 Eagle Point 230 kV 230 800 Gas Withdrawn
Y2-105 Eagle Point 230 50 Gas In Service
W3-125 Eagle Point 230kV 230 27.9 Gas Withdrawn
H26 Eagle Point 230kV 230 25 Gas Withdrawn
X1-039 Eagle Point 230 22.9 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.