Mickelton substation interconnection queue

1 active project totaling 44 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Mickelton as the point of interconnection, all in Gloucester County, NJ.

Target commercial operation dates as filed run from Jun 2023 to Jun 2027 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: AEC (1 filing).

1active projects
44active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1397 Mickelton 230 kV 230 44 Gas Active Jun 2027
AG1-475 Mickelton 230 kV 230 9 Solar Withdrawn Jun 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Gloucester County, NJ

All 88 PJM queue filings in Gloucester County, NJ.