Mickelton substation interconnection queue

1 active project totalling 44 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
44active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1397 Mickelton 230 kV 230 44 Gas Active
AG1-475 Mickelton 230 kV 230 9 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.