Marion substation interconnection queue
3 active projects totalling 6.7 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
6.7active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA1-147 | Marion 345kV | 345 | 400 | Not reported | Withdrawn |
| G25 | Baler LF | 26.4 | 3.8 | Gas | In Service |
| G24 | BCUA LF | 26.4 | 1.9 | Gas | In Service |
| H27 | BCUA LF | 26.4 | 1 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.