Tansboro substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Tansboro as the point of interconnection, all in Camden County, NJ.
Target commercial operation dates as filed run from Dec 2019 to Nov 2020 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-011 | Tansboro 12 kV | 12 | 1.3 | Solar | Withdrawn | Nov 2020 |
| AD2-064 | Tansboro 12kV | 12 | 0.5 | Solar | Withdrawn | Dec 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Camden County, NJ
- Silver Lake: 2 active, 240 MW of 7 filed
- Gloucester: 3 active, 7.1 MW of 8 filed
- Marion: 3 active, 6.7 MW of 4 filed
- Beaverbrook: 2 active, 2.3 MW of 3 filed
- Deptford: 1 active, 1.9 MW of 6 filed
- Cinnaminson: 2 active, 1.4 MW of 2 filed
- Runnemede: 2 active, 1.3 MW of 2 filed
- Camden: 1 active, 0 MW of 8 filed
- Berlin: none active of 4 filed
- Camden-Richmond: none active of 2 filed
- Winslow: none active of 2 filed