Substation Scout

Mickleton substation interconnection queue

4 active projects totalling 729.7 MW in the PJM queue, plus 8 with terminal status (shown greyed).

4active projects
729.7active MW
12total filed
Queue IDProjectkVMWResourceStatus
A13 Mantua Creek Generating Station 230 803 Gas Withdrawn
Q90 West Deptford Energy Station 230 650 Gas In Service
P13 Mickleton 230kV 230 600 Gas Withdrawn
S107 Mickleton 230kV 230 520 Gas Withdrawn
T123 Mickleton 230kV 230 440 Gas Withdrawn
AC1-135 Mickleton 230kV 230 62 Gas Withdrawn
C01-1010 Mickleton 69 kV 69 56.3 Battery Active
T59 Mickleton n/r 14.4 Gas In Service
AF2-024 Mickleton Battery Storage 69 9.6 Battery Withdrawn
Z2-083 West Deptford Energy Station 230 9 Gas In Service
W1-081 Mickleton 12kV 12 1.9 Solar Withdrawn
AA1-104 Mickleton 230kV 230 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.