Substation Scout

Beaverbrook substation interconnection queue

2 active projects totalling 2.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
2.3active MW
3total filed
Queue IDProjectkVMWResourceStatus
AA1-019 Gloucester Solar Farm 13 2.7 Solar Withdrawn
Y3-087 Beaverbrook (Kinsley Solar) 13 1.4 Solar In Service
AE2-064 Kinsley 2 Beaverbrook Solar 13 0.9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.