Williamstown substation interconnection queue

1 active project totaling 0.6 MW in the PJM queue, plus 5 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jul 2011 to Nov 2027 (6 filings).

Transmission owner as filed: EKPC (1 filing).

1active projects
0.6active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-159 Williamstown 69 kV 69 57.6 Hybrid Withdrawn Nov 2027
AH1-068 Williamstown 12.47 kV 12.5 5.9 Solar Withdrawn Dec 2023
W4-054 Williamstown 12kV 12 4.6 Solar Withdrawn May 2012
W1-094 Williamstown 12kV 12 3.8 Solar Withdrawn Jul 2011
W3-035 Williamstown 12kV 12 2.7 Solar Withdrawn Mar 2012
AD2-135 Monroe-Sicklerville Road LF Solar 12 0.6 Solar Partially in Service - Under Construction Mar 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Grant County, KY

All 2 PJM queue filings in Grant County, KY.

Other PJM queue substations in Gloucester County, NJ

All 88 PJM queue filings in Gloucester County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first