Williamstown substation interconnection queue

1 active project totalling 0.6 MW in the PJM queue, plus 5 with terminal status (shown greyed).

1active projects
0.6active MW
6total filed
Queue IDProjectkVMWResourceStatus
AG2-159 Williamstown 69 kV 69 57.6 Hybrid Withdrawn
AH1-068 Williamstown 12.47 kV 12.5 5.9 Solar Withdrawn
W4-054 Williamstown 12kV 12 4.6 Solar Withdrawn
W1-094 Williamstown 12kV 12 3.8 Solar Withdrawn
W3-035 Williamstown 12kV 12 2.7 Solar Withdrawn
AD2-135 Monroe-Sicklerville Road LF Solar 12 0.6 Solar Partially in Service - Under Construction

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.