Thorofare substation interconnection queue

1 active project totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

4 PJM queue filings name Thorofare as the point of interconnection, all in Gloucester County, NJ.

Target commercial operation dates as filed run from Dec 2012 to Mar 2020 (4 filings).

1active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-213 Thorofare 13.2 kV 13.2 1.1 Hybrid Withdrawn Mar 2020
AA1-105 Thorofare 13kV 13 0 Battery Withdrawn Nov 2015
AA2-126 Thorofare 13kV 13 0 Battery Withdrawn Apr 2016
X2-013 Mantua Creek Frequency Regularor 13 0 Battery In Service Dec 2012

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Gloucester County, NJ

All 88 PJM queue filings in Gloucester County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first