Substation Scout

Gloucester, NJ interconnection queue

22 active projects totalling 1,788.6 MW in the PJM queue, plus 66 with terminal status (shown greyed).

22active projects
1,788.6active MW
88total filed
Queue IDProjectkVMWResourceStatus
A13 Mantua Creek Generating Station 230 803 Gas Withdrawn
A16 Eagle Point 230 kV 230 800 Gas Withdrawn
A06 Kearny n/r 750 Gas Withdrawn
Q90 West Deptford Energy Station 230 650 Gas In Service
P13 Mickleton 230kV 230 600 Gas Withdrawn
S107 Mickleton 230kV 230 520 Gas Withdrawn
H11 New Freedom - Cardiff 230kV 230 500 Gas Withdrawn
T123 Mickleton 230kV 230 440 Gas Withdrawn
C01-2225 Bridgeport 230 kV 230 300 Other Active
C01-2187 Bridgeport - Mickleton 230 kV 230 250 Battery Active
W4-016 West Deptford Energy Station 230 235 Gas Withdrawn
C01-2223 Bridgeport 230 kV 230 219 Battery Active
AH2-378A Monroe 138kV 138 200 Battery Withdrawn
W4-015 West Deptford Energy Station 230 136 Gas In Service
AG2-450 Bridgeport 230 kV 230 115.3 Battery Withdrawn
AH2-131 Bridgeport 230kV 230 103.7 Battery Withdrawn
AC1-135 Mickleton 230kV 230 62 Gas Withdrawn
AH1-078 Paulsboro 69 kV II 69 58 Gas Withdrawn
C01-1010 Mickleton 69 kV 69 56.3 Battery Active
Y2-105 Eagle Point 230 50 Gas In Service
C01-1397 Mickelton 230 kV 230 44 Gas Active
AE2-335 Gloucester Solar II n/r 41.5 Solar Withdrawn
AG1-476 Mickelton 230 kV II 230 33.1 Hybrid Withdrawn
AE2-039 Clayton-Williamstown 69 kV 69 28.7 Solar Withdrawn
W3-125 Eagle Point 230kV 230 27.9 Gas Withdrawn
AE2-334 Gloucester Solar I 69 26.4 Solar Withdrawn
H26 Eagle Point 230kV 230 25 Gas Withdrawn
AG2-627 Woodstown-High Street 69 kV 69 24 Solar Withdrawn
X1-039 Eagle Point 230 22.9 Gas In Service
AG2-180 Paulsboro 69 kV 69 20 Gas Withdrawn
AH1-701 Valero 69 kV 69 20 Hybrid Active
T59 Mickleton n/r 14.4 Gas In Service
Z2-004 Mantua Township 12kV 12 10 Other Withdrawn
AF2-024 Mickleton Battery Storage 69 9.6 Battery Withdrawn
AG1-475 Mickelton 230 kV 230 9 Solar Withdrawn
Z2-083 West Deptford Energy Station 230 9 Gas In Service
AH1-274 Butler 69 kV 69 7 Solar Withdrawn
X1-076 East Greenwich Township 12kV 12 6.8 Solar Withdrawn
AG1-499 Esky Solar Project 12.5 6 Solar Under Construction
AH1-068 Williamstown 12.47 kV 12.5 5.9 Solar Withdrawn
AG2-036 Mantua 12 kV 12 5.1 Solar Withdrawn
W4-054 Williamstown 12kV 12 4.6 Solar Withdrawn
AH1-067 Minotola 12.47 kV 12.5 4.2 Solar Withdrawn
W1-094 Williamstown 12kV 12 3.8 Solar Withdrawn
W4-018 Monroeville 12kV 12 3.8 Solar Withdrawn
W4-040 Harrison Township 12kV 12 3.8 Solar Withdrawn
W4-095 Beckett 12kV 12 3.8 Solar Withdrawn
X2-016 Harrison Township 12kV 12 3.8 Solar Withdrawn
X2-017 Elk Township 12kV #1 12 3.8 Solar Withdrawn
X2-018 Elk Township 12kV #2 12 3.8 Solar Withdrawn
X2-048 South Harrison Township 12kV 12 3.8 Solar Withdrawn
W2-031 Gloucester 26kV 26 3.2 Solar Withdrawn
W3-035 Williamstown 12kV 12 2.7 Solar Withdrawn
AC1-010 National Park NJ 26 2.2 Solar Partially in Service - Under Construction
AC2-169 Nortonville 12kV 12 2.1 Solar Withdrawn
V4-013 Gloucester 26kV 26 2 Solar Withdrawn
U4-036 Paradise SP 26.4 1.9 Solar In Service
W1-081 Mickleton 12kV 12 1.9 Solar Withdrawn
W2-027 Terrace 12kV 12 1.9 Solar Withdrawn
W2-065 Woodstown Road 12kV 12 1.9 Solar Withdrawn
X2-069 Swedesboro n/r 1.9 Solar Withdrawn
Y2-081 Deptford (Kinsley Solar)13kV 13 1.9 Solar In Service
AE2-066 Gloucester 13 kV 13 1.9 Solar Withdrawn
AE1-219 Glassboro RE Solar 12 1.8 Solar Withdrawn
W1-083 West Deptford Solar 13 1.7 Solar Withdrawn
AE2-101 Nortonville 12 kV 12 1.7 Solar Withdrawn
AI2-204 Brokaw 345kV (CIR Increase) 345 1.6 Solar Withdrawn
Y3-087 Beaverbrook (Kinsley Solar) 13 1.4 Solar In Service
AF1-264 Owens Corning Solar 13 1.3 Solar In Service
AE2-213 Thorofare 13.2 kV 13.2 1.1 Hybrid Withdrawn
AE2-064 Kinsley 2 Beaverbrook Solar 13 0.9 Solar In Service
AE1-218 Glassboro LF Solar 12 0.8 Solar Withdrawn
AE2-065 Kinsley 2 Deptford Solar 12 0.8 Solar In Service
AE2-088 Clayton 12 kV 12 0.7 Hybrid Withdrawn
AD2-135 Monroe-Sicklerville Road LF Solar 12 0.6 Solar Partially in Service - Under Construction
AA1-104 Mickleton 230kV 230 0 Battery Withdrawn
AA1-105 Thorofare 13kV 13 0 Battery Withdrawn
AA2-126 Thorofare 13kV 13 0 Battery Withdrawn
AB2-105 Mantua 12kV 12 0 Gas Withdrawn
AC1-196 Mantua 12kV 12 0 Gas Withdrawn
AC2-139 The Home Depot Store # 0974 12 0 Gas Withdrawn
AE1-043 Clayton-Woodstown 12 kV 12 0 Solar Withdrawn
AE2-043 Franklinville 138 kV 138 0 Solar Withdrawn
AE2-144 Deptford 13.2 kV 13.2 0 Hybrid Withdrawn
AG1-103 Gloucester Solar I 69 0 Battery Withdrawn
W2-026 Suncatcher Clean Energy n/r 0 Solar Withdrawn
X2-013 Mantua Creek Frequency Regularor 13 0 Battery In Service
X4-004 Johnson Matthey 26.4 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.