Substation Scout

Silver Lake substation interconnection queue

2 active projects totaling 240 MW in the PJM queue, plus 5 with terminal status (shown grayed).

Target commercial operation dates as filed run from May 2015 to Dec 2029 (7 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: ComEd (2 filings).

2active projects
240active MW
7total filed
Queue IDProjectkVMWResourceStatusTarget COD
Z2-041 Silver Lake n/r 435 Gas Withdrawn May 2018
X2-019 Silver Lake 345kV 345 180 Gas Withdrawn May 2015
AG2-545 Silver Lake 345 kV 345 160 Battery Active Dec 2029
AG2-544 Silver Lake 345 kV 345 80 Battery Active Dec 2029
AG1-110 Silver Lake 69 kV 69 20 Battery Withdrawn Nov 2022
AE1-062 Silver Lake 69 kV 69 10 Battery Withdrawn Oct 2020
AF1-160 Silver Lake 69 kV 69 10 Battery Withdrawn Nov 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in McHenry County, IL

All 35 PJM queue filings in McHenry County, IL.

Other PJM queue substations in Lake County, IL

All 20 PJM queue filings in Lake County, IL.

Other PJM queue substations in Camden County, NJ

All 46 PJM queue filings in Camden County, NJ.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first