FLR Florence Landfill (AF2-247) is listed in the PJM interconnection queue as a 2.1 MW solar project in Burlington County, NJ. The filing names Bustleton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2022.
| Queue ID | AF2-247 |
|---|---|
| Project name | FLR Florence Landfill |
| Status (as published) | In Service |
| Substation | Bustleton |
| Point of interconnection | Bustleton 13.2 kV |
| County | Burlington |
| State | NJ |
| Voltage | 13.2 kV |
| Capacity | 2.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2022-06-30 |
| Source dataset | serial |
Same substation and county
Bustleton substation: 5 requests in the PJM queue, 1 active totaling 2.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J04 | Bustleton 138kV | 7 | Gas | Withdrawn |
| AE2-016 | Bustleton 13.2 kV | 2.4 | Solar | Withdrawn |
| AG2-422 | Burlington Energy Storage | 0 | Hybrid | Withdrawn |
| X3-007 | LB Solar | 0 | Solar | Withdrawn |
Burlington, NJ: 118 requests in the PJM queue, 31 active totaling 656.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 5 |
| MW capacity | 2.1 |
| MFO | 5 |