TMI substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 7 with terminal status (shown greyed).
0active projects
0active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| A40 | TMI 500 kV | 500 | 1,271 | Gas | Withdrawn |
| A41 | TMI 500 kV | 500 | 765 | Gas | Withdrawn |
| F01 | TMI | n/r | 551 | Gas | Withdrawn |
| B32 | TMI 230kV | 230 | 500 | Gas | Withdrawn |
| A54 | TMI 230 kV | 230 | 45 | Nuclear | Withdrawn |
| Y1-056 | TMI | n/r | 19 | Nuclear | Withdrawn |
| T182 | Three Mile Island 1 | 230 | 16.8 | Nuclear | Deactivated |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.