Substation Scout

Brunner Island substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
G33 Brunner Island 230kV 230 1,200 Gas Withdrawn
AF2-228 Brunner Island 13.8 kV 13.8 36.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.