Muddy Run substation interconnection queue
1 active project totalling 160 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
160active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U1-016 | Muddy Run | n/r | 700 | Gas | Withdrawn |
| B28 | Muddy Run | 230 | 160 | Hydro | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.